Abstract:
As WPPs (especially for offshore) have reached GW size, and the connection of WPP to the system is becoming more complex in terms of the technologies and distance to shore, the design and compliance tests of the WPPs is more technical demanding, expensive, but crucial for the safe and economic operation of WPPs. The presentation will give an update on IEC61400-21-5, which is to specify hardware-in-the-loop (HiL) test bench for WPPs including the validation and verification procedures for the WT and WPP control replica, and the use cases for such replica.
Anosh Arshad Sundhu – Technical University of Denmark